SP8: Ensure continuity: Difference between revisions
No edit summary |
No edit summary |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<itpmch><title>SP8: | <itpmch><title>SP8: Ensure continuity | YaSM Service Management Wiki</title> | ||
<meta name="keywords" content="yasm | <meta name="keywords" content="yasm service continuity management, yasm disaster management, service management continuity process" /> | ||
<meta name="description" content="The | <meta name="description" content="The service continuity process in YaSM ensures service continuity in the case of critical, disruptive events considered disasters, such as floods, fires, power failures, etc." /> | ||
<meta property="og:url" content="https://yasm.com/wiki/en/index.php/SP8: | <meta property="og:url" content="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity" /> | ||
<meta property="og:title" content="SP8: | <meta property="og:title" content="SP8: Ensure continuity | YaSM Service Management Wiki" /> | ||
<meta property="og:description" content=" | <meta property="og:description" content="TThe service continuity process in YaSM ensures service continuity in the case of critical, disruptive events considered disasters, such as floods, fires, power failures, etc." /> | ||
<meta property="og:site_name" content="YaSM"> | <meta property="og:site_name" content="YaSM Service Management"> | ||
<meta property="og:type" content="article" /> | <meta property="og:type" content="article" /> | ||
<meta property="og:image" content="https://yasm.com/wiki/en/img/yasm-process/16x9/Ensure-continuity-yasm-sp8.jpg" /> | |||
<meta property="og:image" content="https://yasm.com/wiki/en/img/yasm-process/16x9/ | |||
<meta property="og:image:width" content="1200" /> | <meta property="og:image:width" content="1200" /> | ||
<meta property="og:image:height" content="675" /> | <meta property="og:image:height" content="675" /> | ||
<link href="https://plus.google.com/104150539756444616711/posts" rel="publisher" /> | <link href="https://plus.google.com/104150539756444616711/posts" rel="publisher" /> | ||
</itpmch> | </itpmch> | ||
<html | <html><div class="noresize"><a href="https://yasm.com/wiki/de/index.php/SP8:_Gewährleisten_von_Kontinuität"><img src="https://yasm.com/wiki/en/img/yasm-wiki/YaSM-Wiki-Deutsch.png" width="140" height="36" style="float:right;" alt="auf Deutsch" title="This page in German" /></a></div><br style="clear:both;"/> | ||
<p> </p> | <p> </p> | ||
<p><b>Process name:</b> <a href="#Process_description"> | <p><b>Process name:</b> <a href="#Process_description">Ensure continuity</a> - <b>Part of:</b> <a href="/wiki/en/index.php/Service_Management_Processes#Supporting_processes" title="The supporting processes in YaSM service management">Supporting processes</a> | ||
</p><p><b>Previous process:</b> <a href="/wiki/en/index.php/SP7:_Ensure_security" title="SP7: Ensure security">Ensure security</a> | </p><p><b>Previous process:</b> <a href="/wiki/en/index.php/SP7:_Ensure_security" title="SP7: Ensure security">Ensure security</a> | ||
</p><p><b>Next process:</b> <a href="/wiki/en/index.php/SP9:_Ensure_compliance" title="SP9: Ensure compliance">Ensure compliance</a></html> | </p><p><b>Next process:</b> <a href="/wiki/en/index.php/SP9:_Ensure_compliance" title="SP9: Ensure compliance">Ensure compliance</a></html> | ||
Line 31: | Line 22: | ||
==Process description== | ==Process description== | ||
<html><span id="md-itempage-description" itemprop="description">The | <html><span id="md-itempage-description" itemprop="description">The service continuity process in YaSM (<a href="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" title="YaSM service continuiy management SP8">fig. 1</a>) ensures service continuity in the case of critical, disruptive events, such as floods, fires, power failures, etc.</span></p> | ||
<p>Preparing for | <p>Preparing for critical events starts with the compilation of a register of managed critical events, which lists the types of disruptive events for which the service provider has decided to put some kind of preparation in place. The register also specifies the responses to the identified events, in particular the related service continuity plans.</p> | ||
<div style="float:left;"> | <div style="float:left;"> | ||
<div itemid="https://yasm.com/wiki/en/img/yasm-process/ | <div itemid="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" itemscope itemtype="https://schema.org/ImageObject"> | ||
<a href="https://yasm.com/wiki/en/img/yasm-process/ | <a href="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" title="YaSM service continuity process SP8" itemprop="contentUrl"> | ||
<meta itemprop="width" content="1200" /> | <meta itemprop="width" content="1200" /> | ||
<meta itemprop="height" content="900" /> | <meta itemprop="height" content="900" /> | ||
<meta itemprop="keywords" content="yasm service continuity" /> | <meta itemprop="keywords" content="yasm service continuity" /> | ||
<meta itemprop="keywords" content="service continuity management" /> | <meta itemprop="keywords" content="service continuity management" /> | ||
<meta itemprop="keywords" content="yasm disaster preparation" /> | |||
<meta itemprop="keywords" content="ITIL 4 service continuity management" /> | <meta itemprop="keywords" content="ITIL 4 service continuity management" /> | ||
<meta itemprop="representativeOfPage" content="true"/> | <meta itemprop="representativeOfPage" content="true"/> | ||
<meta itemprop="dateCreated" content=" | <meta itemprop="dateCreated" content="2023-11-10" /> | ||
<meta itemprop=" | <meta itemprop="dateModified" content="2024-05-20" /> | ||
<span itemprop="thumbnail" itemscope itemtype="https://schema.org/ImageObject"> | <span itemprop="thumbnail" itemscope itemtype="https://schema.org/ImageObject"> | ||
<meta itemprop="url" content="https://yasm.com/wiki/en/img/yasm-process/16x9/ | <meta itemprop="url" content="https://yasm.com/wiki/en/img/yasm-process/16x9/Ensure-continuity-yasm-sp8.jpg" /> | ||
<meta itemprop="width" content="1200" /> | <meta itemprop="width" content="1200" /> | ||
<meta itemprop="height" content="675" /> | <meta itemprop="height" content="675" /> | ||
<meta itemprop="dateCreated" content=" | <meta itemprop="dateCreated" content="2023-11-10" /> | ||
<meta itemprop="datePublished" content=" | <meta itemprop="datePublished" content="2023-11-10" /> | ||
<meta itemprop="dateModified" content="2024-05-20" /> | |||
</span> | </span> | ||
<img style="margin:20px 0px 10px 0px; float:left;" | <img style="margin:20px 0px 10px 0px; float:left;" srcset="https://yasm.com/wiki/en/img/yasm-process/480px/Ensure-continuity-yasm-sp8.jpg 480w, https://yasm.com/wiki/en/img/yasm-process/800px/Ensure-continuity-yasm-sp8.jpg 800w, https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg 1200w" sizes="100vw" src="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" decoding="async" width="800" height="600" title="Ensure continuity. - YaSM continuity management process SP8" alt="Fig. 1: Ensure continuity. - YaSM continuity management and disaster prevention process SP8. - Related with: Practice of ITIL 4 service continuity management." /></a><br style="clear:both;"/> | ||
<div class="thumbcaption" style="margin:15px 0px 20px 0px"><span itemprop="caption"><span style="font-variant:small-caps;"><b>Fig. 1: '<a href="https://yasm.com/wiki/en/img/yasm-process/ | <div class="thumbcaption" style="margin:15px 0px 20px 0px"><span itemprop="caption"><span style="font-variant:small-caps;"><b>Fig. 1: 'Ensure continuity'</b><br /><a href="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" title="YaSM service continuity management SP8">YaSM service continuity management process ('SP8')</a>.</span></span></div></div></div><br style="clear:both;"/> | ||
<p>The continuity manager may ensure service continuity in a number of ways. Most importantly, this role is involved in the service design and build stages to ensure continuity aspects are taken into account when creating or updating services. Once it has been established during service design which continuity arrangements and mechanisms are required for a new service, these can be put in place, notably</p> | <p>The continuity manager may ensure service continuity in a number of ways. Most importantly, this role is involved in the service design and build stages to ensure continuity aspects are taken into account when creating or updating services. Once it has been established during service design which continuity arrangements and mechanisms are required for a new service, these can be put in place, notably</p> | ||
<ul> | <ul> | ||
<li>Through the service build process, by adding suitable continuity features to the service infrastructure that is to be created</li> | <li>Through the service build process, by adding suitable continuity features to the service infrastructure that is to be created</li> | ||
<li>Through the | <li>Through the continuity management process, by updating continuity arrangements and mechanisms which are operated under the responsibility of the service continuity manager.</li></ul> | ||
<p>The service continuity manager is also involved in service or process improvement initiatives if service continuity aspects are to be considered.</p> | <p>The service continuity manager is also involved in service or process improvement initiatives if service continuity aspects are to be considered.</p> | ||
<p>If new types of | <p>If new types of critical events are to be addressed or if the continuity arrangements need to be upgraded for other reasons, the service continuity management process may start continuity improvement initiatives on its own account. Such initiatives are managed through the continuity improvement plan.</p> | ||
<p> </p> | <p> </p> | ||
<p><i><u>Compatibility</u>: The YaSM | <p><i><u>Compatibility</u>: The YaSM continuity management process is <a href="/wiki/en/index.php/YaSM_and_ISO_20000#ISO_20000_requirements_and_related_service_management_processes" title="YaSM and ISO 20000">aligned with ISO 20000</a>, the international standard for service management (see ISO/IEC 20000-1:2018, <a href="/wiki/en/index.php/YaSM_and_ISO_20000#Service-assurance" title="ISO 20000 section 8.7: Service Assurance">section 8.7</a>), and it <a href="/wiki/en/index.php/YaSM_and_ITIL#ITIL-4-Service-continuity-management" title="ITIL 4 practices and YaSM processes: ITIL 4 service continuity management">corresponds to the practice of 'ITIL 4 service continuity management'</a>.</i></html> | ||
==Sub-processes== | ==Sub-processes== | ||
<html>YaSM's | <html>YaSM's service continuity management process has the following sub-processes:</p> | ||
<!-- define schema.org/CreativeWork --> | <!-- define schema.org/CreativeWork --> | ||
<link id="md-type-subProcess" itemprop="additionalType" href="http://www.productontology.org/id/Procedure_(business)" /> | <link id="md-type-subProcess" itemprop="additionalType" href="http://www.productontology.org/id/Procedure_(business)" /> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | <div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.1" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | ||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.1" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.1" /> | ||
<dl id="SP8.1"><dt itemprop="name">SP8.1: Assess risks associated with | <dl id="SP8.1"><dt itemprop="name">SP8.1: Assess risks associated with critical events</dt> | ||
<dd itemprop="description">Process objective: To identify the | <dd itemprop="description">Process objective: To identify the disruptive events which need to be managed by the service provider, and to define appropriate continuity arrangements and mechanisms.</dd></dl> | ||
</div> | </div> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.2" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | |||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | |||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.2" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.2" /> | ||
<dl id="SP8.2"><dt itemprop="name">SP8.2: Define continuity improvements</dt> | <dl id="SP8.2"><dt itemprop="name">SP8.2: Define continuity improvements</dt> | ||
<dd itemprop="description">Process objective: To define the objectives of initiatives to improve service continuity and the approach for their implementation. This includes creating business cases for the initiatives.</dd></dl> | <dd itemprop="description">Process objective: To define the objectives of initiatives to improve service continuity and the approach for their implementation. This includes creating business cases for the initiatives.</dd></dl> | ||
</div> | </div> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.3" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | |||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | |||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.3" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.3" /> | ||
<dl id="SP8.3"><dt itemprop="name">SP8.3: Start up continuity improvement initiatives</dt> | <dl id="SP8.3"><dt itemprop="name">SP8.3: Start up continuity improvement initiatives</dt> | ||
<dd itemprop="description">Process objective: To launch initiatives aimed at ensuring or improving service continuity. This includes obtaining authorization by requesting a budget and submitting a request for change.</dd></dl> | <dd itemprop="description">Process objective: To launch initiatives aimed at ensuring or improving service continuity. This includes obtaining authorization by requesting a budget and submitting a request for change.</dd></dl> | ||
</div> | </div> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.4" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | |||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | |||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.4" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.4" /> | ||
<dl id="SP8.4"><dt itemprop="name">SP8.4: Implement continuity arrangements</dt> | <dl id="SP8.4"><dt itemprop="name">SP8.4: Implement continuity arrangements</dt> | ||
<dd itemprop="description">Process objective: To implement, test and deploy new or improved continuity arrangements and mechanisms.</dd></dl> | <dd itemprop="description">Process objective: To implement, test and deploy new or improved continuity arrangements and mechanisms.</dd></dl> | ||
</div> | </div> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.5" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | |||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | |||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.5" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.5" /> | ||
<dl id="SP8.5"><dt itemprop="name">SP8.5: Operate the continuity arrangements</dt> | <dl id="SP8.5"><dt itemprop="name">SP8.5: Operate the continuity arrangements</dt> | ||
<dd itemprop="description">Process objective: To arrange adequate training to prepare the service provider's staff and customers for | <dd itemprop="description">Process objective: To arrange adequate training to prepare the service provider's staff and customers for critical events, and to ensure regular maintenance and testing of the continuity arrangements and mechanisms.</dd></dl> | ||
</div> | </div> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.6" itemscope itemtype="https://schema.org/CreativeWork" itemref="md-type-subProcess"> | |||
<div itemid="https://yasm.com/wiki/en/index.php/SP8: | |||
<meta itemprop="alternateName" content="YaSM service continuity process SP8.6" /> | <meta itemprop="alternateName" content="YaSM service continuity process SP8.6" /> | ||
<dl id="SP8.6"><dt itemprop="name">SP8.6: Review the continuity arrangements</dt> | <dl id="SP8.6"><dt itemprop="name">SP8.6: Review the continuity arrangements</dt> | ||
<dd itemprop="description">Process objective: To submit the continuity arrangements and mechanisms to regular reviews, in order to identify potentials for improvement to be addressed by continuity improvement initiatives.</dd></dl> | <dd itemprop="description">Process objective: To submit the continuity arrangements and mechanisms to regular reviews, in order to identify potentials for improvement to be addressed by continuity improvement initiatives.</dd></dl> | ||
</div><!-- end of schema.org/CreativeWork --><p></html> | </div><!-- end of schema.org/CreativeWork --><p></html> | ||
==Process outputs== | ==Process outputs== | ||
<html><div itemid="https://yasm.com/wiki/en/index.php/SP8: | <html><!-- define schema.org/DefinedTermSet --> | ||
<div itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#process-inputs-outputs" itemscope="itemscope" itemtype="https://schema.org/DefinedTermSet"> | |||
<link itemprop="additionalType" href="http://www.productontology.org/id/Input/output" /> | |||
<meta itemprop="name" content="YaSM process SP8: documents and records" /> | <meta itemprop="name" content="YaSM process SP8: documents and records" /> | ||
<meta itemprop="alternateName" content=" | <meta itemprop="alternateName" content="Service continuity management process outputs" /> | ||
<meta itemprop="alternateName" content=" | <meta itemprop="alternateName" content="Service continuity management data objects" /> | ||
<p><span itemprop="description">This section lists the documents and records produced by ' | <p><span itemprop="description">This section lists the documents and records produced by 'ensure service continuity'.</span> YaSM data objects <a href="#ydo" title="YaSM data object">[*]</a> are marked with an asterisk, while other objects are displayed in gray.</p> | ||
<dl><dt>Budget request</dt> | <dl> | ||
<dd>A budget request is typically issued to obtain funding for setting up, improving or operating a service or process. An approved budget request means that the required financial resources have been allocated by the financial manager. <a href="#ydo" title="YaSM data object">[*]</a></dd></ | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Budget request</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A budget request is typically issued to obtain funding for setting up, improving or operating a service or process. An approved budget request means that the required financial resources have been allocated by the financial manager. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
<dd | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Change record</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A change record contains all details of a change, documenting the lifecycle of a single change. In its initial state, a change record describes a request for change (RFC) which is to be assessed and authorized prior to implementing the change. Further information is added as the change progresses through its lifecycle. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
<dd>Current status information related to the implementation of a change. This information is sent to the change manager from the various processes that implement authorized changes. It is used by the change manager to keep the change records and the change schedule up-to-date.</dd></ | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Change status information</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">Current status information related to the implementation of a change. This information is sent to the change manager from the various processes that implement authorized changes. It is used by the change manager to keep the change records and the change schedule up-to-date.</dd></div> | |||
<dd>Configuration information is maintained in CI records for all configuration items (CIs) under the control of the configuration manager. In this context, CIs can be of various types: Applications, systems and other infrastructure components are treated as CIs, but often also services, policies, project documentation, employees, suppliers, etc. Configuration information is stored in the configuration management system (CMS). <a href="#ydo" title="YaSM data object">[*]</a></dd></ | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">CI record</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">Configuration information is maintained in CI records for all configuration items (CIs) under the control of the configuration manager. In this context, CIs can be of various types: Applications, systems and other infrastructure components are treated as CIs, but often also services, policies, project documentation, employees, suppliers, etc. Configuration information is stored in the configuration management system (CMS). <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd>Items in the continuity improvement plan are used by the service continuity manager to record and manage continuity improvement initiatives throughout their lifecycle. Initiatives in the continuity improvement plan may aim to enhance the resilience of services or to put mechanisms in place for the recovery of services in the case of | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Continuity-improvement-plan">Continuity improvement plan</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">Items in the continuity improvement plan are used by the service continuity manager to record and manage continuity improvement initiatives throughout their lifecycle. Initiatives in the continuity improvement plan may aim to enhance the resilience of services or to put mechanisms in place for the recovery of services in the case of critical events. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Continuity-operation-manual">Continuity operation manual</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">The continuity operation manual specifies the activities required for the operation of the continuity arrangements and mechanisms operated under the responsibility of the service continuity manager. Some instructions related to the operation of particular security systems may be documented in separate technical manuals or 'standard operating procedures (SOPs)'. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd>A continuity review report records the details and findings from a continuity review. This report is an important input for the definition of continuity improvement initiatives. <a href="#ydo" title="YaSM data object">[*]</a></dd></ | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Continuity-review-report">Continuity review report</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A continuity review report records the details and findings from a continuity review. This report is an important input for the definition of continuity improvement initiatives. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
<dd>Current information related to project progress and resource consumption. This information is sent from various service management processes to the project manager as input for project control.</dd></ | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Data for project plan update</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">Current information related to project progress and resource consumption. This information is sent from various service management processes to the project manager as input for project control.</dd></div> | ||
<dd>The guideline for | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Guideline-for-critical-events">Guideline for critical events</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">The guideline for critical events contains detailed instructions on when and how to invoke the procedure for responding to critical, disruptive events. Most importantly, the guideline defines the first steps to be taken by 1st level support after learning that a (suspected) critical event has occurred. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Index-of-continuity-relevant-information">Index of continuity-relevant information</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">A catalogue of all information that is relevant in the context of responding to critical, disruptive events. This index is maintained and circulated by the service continuity manager to all members of staff with responsibilities for fighting critical events. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Purchase request</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A request to procure goods or services from an external supplier. Purchasing requests are typically sent to the supplier manager, for example if applications, systems or other infrastructure components are needed for setting up a new service, or if standard infrastructure components and consumables are required for service operation.</dd></div> | |||
<dd>Recovery plans contain detailed instructions for returning specific services and/ or systems to a working state, which often includes recovering data to a defined consistent state. <a href="#ydo" title="YaSM data object">[*]</a></dd></ | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Recovery plan</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">Recovery plans contain detailed instructions for returning specific services and/ or systems to a working state, which often includes recovering data to a defined consistent state. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd>The register of managed | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Register-of-managed-critical-events">Register of managed critical events</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">The register of managed critical events is a tool used by the service continuity manager to keep an overview of the critical events against which the service provider has decided to set up some kind of protection, considering the potential impacts and occurrence likelihoods. The register of managed critical events also specifies the responses to the identified events, in particular the related service continuity plans. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
<dd>A request to assess security risks, typically issued during service design if new or changed security controls and mechanisms are likely to be needed for a new or improved service.</dd></ | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Request to assess security risks</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">A request to assess security risks, typically issued during service design if new or changed security controls and mechanisms are likely to be needed for a new or improved service.</dd></div> | ||
<dd>A service continuity plan describes how service continuity is ensured with regards to a particular type of | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Service-continuity-plan">Service continuity plan</dt> | ||
< | <dd itemprop="description" style="margin-bottom: 1em;">A service continuity plan describes how service continuity is ensured with regards to a particular type of critical event. The plan specifies the required preventive measures and describes how to effectively respond to the critical event. Service continuity plans usually include references to more detailed recovery plans with specific instructions for returning applications, systems or other infrastructure components to a working state. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | ||
<dd>A suggestion for improving service continuity. Suggestions for continuity improvements may originate from anywhere within the organization.</dd></ | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name" id="Suggested-continuity-improvement">Suggested continuity improvement</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A suggestion for improving service continuity. Suggestions for continuity improvements may originate from anywhere within the organization.</dd></div> | |||
<dd | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Suggested process modification</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A suggestion for modifying one or several service management processes. Suggestions for process modifications or improvements may originate from anywhere within the organization.</dd></div> | |||
<dd>A suggestion for modifying a service, for example to improve service quality or economics. Suggestions may originate from anywhere within or outside of the service provider organization.</dd></ | <div style="color:#636363" itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Suggested service modification</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A suggestion for modifying a service, for example to improve service quality or economics. Suggestions may originate from anywhere within or outside of the service provider organization.</dd></div> | |||
<dd>A test report provides a detailed account of testing activities. A test report is created for example during tests of new or changed service components, or during tests of security or service continuity mechanisms. <a href="#ydo" title="YaSM data object">[*]</a></dd></ | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
< | <dt itemprop="name">Test report</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A test report provides a detailed account of testing activities. A test report is created for example during tests of new or changed service components, or during tests of security or service continuity mechanisms. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
<dd>A test script specifies a set of test cases including their expected outcomes. The nature of the test cases will vary depending on what is to be tested. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl> | <div itemprop="hasDefinedTerm" itemscope itemtype="https://schema.org/DefinedTerm"> | ||
</div><!-- end of schema.org/ | <dt itemprop="name">Test script</dt> | ||
<dd itemprop="description" style="margin-bottom: 1em;">A test script specifies a set of test cases including their expected outcomes. The nature of the test cases will vary depending on what is to be tested. <a href="#ydo" title="YaSM data object">[*]</a></dd></div> | |||
</dl> | |||
</div><!-- end of schema.org/DefinedTermSet --><p> | |||
<p> </p> | <p> </p> | ||
<hr /> | <hr /> | ||
<p><i><u>Notes</u>:</i> | <p><i><u>Notes</u>:</i> | ||
</p><p><span id="ydo"><strong>[*]</strong> <i>"YaSM data objects"</i> are those documents or records for which the YaSM model provides detailed recommendations: Every YaSM object has an associated checklist (see <a href="https://yasm.com/wiki/en/index.php/Service_Management_Checklists" title="Example: YaSM checklists and document templates">example</a>) describing its typical contents, and an associated lifecycle diagram depicting how the status of the object changes as it is created, updated, read and archived by various YaSM processes (see <a href="https://yasm.com/wiki/en/img/yasm-project/Yasm-object-lifecycle-diagram.jpg" title="Example: YaSM object lifecycle diagram (.JPG)">example</a>).</span> | </p><p><span id="ydo"><strong>[*]</strong> <i>"YaSM data objects"</i> are those documents or records for which the YaSM model provides detailed recommendations: Every YaSM object has an associated checklist (see <a href="https://yasm.com/wiki/en/index.php/Service_Management_Checklists" title="Example: YaSM service management checklists and document templates">example</a>) describing its typical contents, and an associated lifecycle diagram depicting how the status of the object changes as it is created, updated, read and archived by various YaSM processes (see <a href="https://yasm.com/wiki/en/img/yasm-project/Yasm-object-lifecycle-diagram.jpg" title="Example: YaSM object lifecycle diagram (.JPG)">example</a>).</span> | ||
</p><p><i>"Other objects"</i> are mostly informal data or information where YaSM has less strong views about their contents. There are no associated lifecycle diagrams or checklists.</html> | </p><p><i>"Other objects"</i> are mostly informal data or information where YaSM has less strong views about their contents. There are no associated lifecycle diagrams or checklists.</html> | ||
==Process metrics== | ==Process metrics== | ||
Line 197: | Line 181: | ||
Process metrics are used, for example, to assess if the service management processes are running according to expectations. | Process metrics are used, for example, to assess if the service management processes are running according to expectations. | ||
For suggestions of [[Service Management Metrics|suitable metrics]], please refer to the [[Service_Management_Metrics# | For suggestions of [[Service Management Metrics|suitable metrics]], please refer to the [[Service_Management_Metrics#Metrics_for_the_service_continuity_process|list of metrics for the YaSM service continuity process]]. | ||
==Roles and responsibilities== | ==Roles and responsibilities== | ||
<span id="responsible">Process owner: The '''service continuity manager''' is responsible for managing risks that could seriously impact the service provider's services. In particular, this role ensures that the service provider can provide minimum agreed service levels in the case of critical, disruptive events.</span> | |||
<p> </p> | <p> </p> | ||
{| class="wikitable | {| class="wikitable" style="background: white; font-size: 95%" | ||
|+ | |+style="background:#465674; color:#ffffff; font-size: 110%"|Responsibility matrix: 'SP8: Ensure continuity' | ||
|- style="vertical-align:top" | |- style="vertical-align:top" | ||
! colspan="2"| YaSM role / sub-process | ! colspan="2"| YaSM role / sub-process | ||
Line 221: | Line 201: | ||
|- style="text-align:center" | |- style="text-align:center" | ||
| SP8.1 | | SP8.1 | ||
| style="text-align:left"|[[#SP8.1|Assess risks associated with | | style="text-align:left"|[[#SP8.1|Assess risks associated with critical events]] | ||
| - | | - | ||
| - | | - | ||
Line 285: | Line 265: | ||
== Notes == | == Notes == | ||
<html><div itemid="https://yasm.com/wiki/en/img/yasm-process-definition/ | <html><div itemid="https://yasm.com/wiki/en/img/yasm-process/goal-definition/yasm-service-continuity-management-process.jpg" itemscope itemtype="https://schema.org/ImageObject"> | ||
<a href="https://yasm.com/wiki/en/img/yasm-process-definition/ | <a href="https://yasm.com/wiki/en/img/yasm-process/goal-definition/yasm-service-continuity-management-process.jpg" title="Service continuity management and disaster prevention: process objective" itemprop="contentUrl"> | ||
<img style="display: block; float: left; margin-right: | <img style="display: block; float: left; margin-bottom: 10px; margin-right: 10px" srcset="https://yasm.com/wiki/en/img/yasm-process/goal-definition/400px/yasm-service-continuity-management-process.jpg 400w, https://yasm.com/wiki/en/img/yasm-process/goal-definition/yasm-service-continuity-management-process.jpg 1200w" sizes="100vw" src="https://yasm.com/wiki/en/img/yasm-process/goal-definition/yasm-service-continuity-management-process.jpg" decoding="async" width="400" height="209" class="thumbimage" title="Service continuity management and disaster prevention: process goal" alt="The service continuity management process in YaSM ensures that the service provider can provide minimum agreed service levels in the case of critical, disruptive. This is achieved primarily by implementing mechanisms to prevent critical events from happening, and by establishing continuity plans and arrangements for the recovery of services once a critical event has occurred." /> | ||
<meta itemprop="caption" content=" | <meta itemprop="caption" content="Process objective: YaSM service continuity management (SP8)." /> | ||
<meta itemprop="width" content=" | <meta itemprop="width" content="1200" /> | ||
<meta itemprop="height" content=" | <meta itemprop="height" content="627" /> | ||
< | <meta itemprop="dateCreated" content="2023-11-12" /> | ||
<p style="margin-top: 0;">Is based on: The | <meta itemprop="datePublished" content="2023-11-12" /> | ||
<span itemprop="thumbnail" itemscope itemtype="https://schema.org/ImageObject"> | |||
<p>By:  Stefan Kempter <a href="https://www.linkedin.com/in/stefankempter"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/linkedin.jpg" width="16" height="16" title="By: Stefan Kempter | Profile on LinkedIn" alt="Author: Stefan Kempter, IT Process Maps GbR" /></a>  and  Andrea Kempter <a href="https://www.linkedin.com/in/andreakempter"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/linkedin.jpg" width="16" height="16" title="By: Andrea Kempter | Profile on LinkedIn" alt="Contributor: Andrea Kempter, IT Process Maps GbR" /></a>, IT Process Maps.<br style="clear:both;"/ | <meta itemprop="url" content="https://yasm.com/wiki/en/img/yasm-process/goal-definition/400px/yasm-service-continuity-management-process.jpg" /> | ||
<meta itemprop="width" content="400" /> | |||
<meta itemprop="height" content="209" /> | |||
</span></a></div> | |||
<p style="margin-top: 0; word-wrap:normal;">Is based on: The service continuity management process from the <a href="https://yasm.com/en/products/yasm-process-map" title="YaSM Process Map">YaSM Process Map</a>.</p> | |||
<p>By:  Stefan Kempter <a href="https://www.linkedin.com/in/stefankempter"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/linkedin.jpg" width="16" height="16" title="By: Stefan Kempter | Profile on LinkedIn" alt="Author: Stefan Kempter, IT Process Maps GbR" /></a>  and  Andrea Kempter <a href="https://www.linkedin.com/in/andreakempter"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/linkedin.jpg" width="16" height="16" title="By: Andrea Kempter | Profile on LinkedIn" alt="Contributor: Andrea Kempter, IT Process Maps GbR" /></a>, IT Process Maps.<br style="clear:both;"/><p> | |||
<p> </p> | <p> </p> | ||
<p><small> | <p><small> | ||
<span itemprop="breadcrumb" itemscope itemtype=" | <span itemprop="breadcrumb" itemscope itemtype="https://schema.org/BreadcrumbList"> | ||
<span itemprop="itemListElement" itemscope itemtype=" | <span itemprop="itemListElement" itemscope itemtype="https://schema.org/ListItem"> | ||
<a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8: | <a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#Process_description"> | ||
<span itemprop="name">Process description</span></a> | <span itemprop="name">Process description</span></a> | ||
<meta itemprop="position" content="1" /></span> › | <meta itemprop="position" content="1" /></span> › | ||
<span itemprop="itemListElement" itemscope itemtype=" | <span itemprop="itemListElement" itemscope itemtype="https://schema.org/ListItem"> | ||
<a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8: | <a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#Sub-processes"> | ||
<span itemprop="name">Sub-processes</span></a> | <span itemprop="name">Sub-processes</span></a> | ||
<meta itemprop="position" content="2" /></span> › | <meta itemprop="position" content="2" /></span> › | ||
<span itemprop="itemListElement" itemscope itemtype=" | <span itemprop="itemListElement" itemscope itemtype="https://schema.org/ListItem"> | ||
<a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8: | <a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#Process_outputs"> | ||
<span itemprop="name">Process outputs</span></a> | <span itemprop="name">Process outputs</span></a> | ||
<meta itemprop="position" content="3" /></span> › | <meta itemprop="position" content="3" /></span> › | ||
<span itemprop="itemListElement" itemscope itemtype=" | <span itemprop="itemListElement" itemscope itemtype="https://schema.org/ListItem"> | ||
<a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8: | <a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#Process_metrics"> | ||
<span itemprop="name">Metrics</span></a> | <span itemprop="name">Metrics</span></a> | ||
<meta itemprop="position" content="4" /></span> › | <meta itemprop="position" content="4" /></span> › | ||
<span itemprop="itemListElement" itemscope itemtype=" | <span itemprop="itemListElement" itemscope itemtype="https://schema.org/ListItem"> | ||
<a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8: | <a itemprop="item" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#Roles_and_responsibilities"> | ||
<span itemprop="name">Roles</span></a> | <span itemprop="name">Roles</span></a> | ||
<meta itemprop="position" content="5" /></span> | <meta itemprop="position" content="5" /></span> | ||
Line 325: | Line 310: | ||
<!-- define schema.org/ItemPage --> | <!-- define schema.org/ItemPage --> | ||
<div itemscope itemtype="https://schema.org/ItemPage"> | <div itemscope itemtype="https://schema.org/ItemPage"> | ||
<meta itemprop="name Headline" content="SP8: | <meta itemprop="name Headline" content="SP8: Ensure continuity" /> | ||
<meta itemprop="alternativeHeadline" content="YaSM service continuity process" /> | <meta itemprop="alternativeHeadline" content="YaSM service continuity process" /> | ||
<link itemprop="primaryImageOfPage" href="https://yasm.com/wiki/en/img/yasm-process/ | <link itemprop="primaryImageOfPage" href="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" /> | ||
<meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics" /> | <meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics" /> | ||
<meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics/_Supporting_Service_Management_Processes#metrics-sp8" /> | <meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics/_Supporting_Service_Management_Processes#metrics-sp8" /> | ||
Line 336: | Line 321: | ||
<link id="md-type-process" itemprop="additionalType" href="http://www.productontology.org/id/Business_process" /> | <link id="md-type-process" itemprop="additionalType" href="http://www.productontology.org/id/Business_process" /> | ||
<meta itemscope itemprop="mainEntityOfPage" itemType="https://schema.org/ItemPage" | <meta itemscope itemprop="mainEntityOfPage" itemType="https://schema.org/ItemPage" | ||
itemid="https://yasm.com/wiki/en/index.php/ | itemid="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity" itemref="md-itempage-description"> | ||
<meta itemprop="name" content="SP8: | <meta itemprop="name" content="SP8: Ensure continuity" /> | ||
<meta itemprop="alternateName" content="YaSM service continuity process" /> | <meta itemprop="alternateName" content="YaSM service continuity process" /> | ||
<link itemprop="url" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="url" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity" /> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.1"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.2"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.3"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.4"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.5"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#SP8.6"> | ||
<link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8: | <link itemprop="hasPart" href="https://yasm.com/wiki/en/index.php/SP8:_Ensure_continuity#process-inputs-outputs"> | ||
<link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process/ | <link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process/Ensure-continuity-yasm-sp8.jpg" /> | ||
<link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process-definition/ | <link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process/goal-definition/yasm-service-continuity-management-process.jpg" /> | ||
<link itemprop="isPartOf" href="https://yasm.com/wiki/en/index.php/Service_Management_Processes#supporting-processes" /> | <link itemprop="isPartOf" href="https://yasm.com/wiki/en/index.php/Service_Management_Processes#supporting-processes" /> | ||
<meta itemprop="mentions" content="ITIL 4 service continuity management" /> | <meta itemprop="mentions" content="ITIL 4 service continuity management" /> | ||
<meta itemprop="isBasedOnUrl" content="https://yasm.com/en/products/yasm-process-map" /> | <meta itemprop="isBasedOnUrl" content="https://yasm.com/en/products/yasm-process-map" /> | ||
<meta itemprop="inLanguage" content="en" /> | <meta itemprop="inLanguage" content="en" /> | ||
<link itemprop="citation" href="https://yasm.com/wiki/de/index.php/SP8: | <link itemprop="citation" href="https://yasm.com/wiki/de/index.php/SP8:_Gewährleisten_von_Kontinuität" /> | ||
<link itemprop="publisher" href="https://yasm.com/en/#YaSMBrand" /> | <link itemprop="publisher" href="https://yasm.com/en/#YaSMBrand" /> | ||
<link itemprop="copyrightHolder creator" href="https://yasm.com/en/contact#ITProcessMapsOrg" /> | <link itemprop="copyrightHolder creator" href="https://yasm.com/en/contact#ITProcessMapsOrg" /> |
Revision as of 15:36, 30 May 2024
Process name: Ensure continuity - Part of: Supporting processes
Previous process: Ensure security
Next process: Ensure compliance
Process description
The service continuity process in YaSM (fig. 1) ensures service continuity in the case of critical, disruptive events, such as floods, fires, power failures, etc.
Preparing for critical events starts with the compilation of a register of managed critical events, which lists the types of disruptive events for which the service provider has decided to put some kind of preparation in place. The register also specifies the responses to the identified events, in particular the related service continuity plans.
The continuity manager may ensure service continuity in a number of ways. Most importantly, this role is involved in the service design and build stages to ensure continuity aspects are taken into account when creating or updating services. Once it has been established during service design which continuity arrangements and mechanisms are required for a new service, these can be put in place, notably
- Through the service build process, by adding suitable continuity features to the service infrastructure that is to be created
- Through the continuity management process, by updating continuity arrangements and mechanisms which are operated under the responsibility of the service continuity manager.
The service continuity manager is also involved in service or process improvement initiatives if service continuity aspects are to be considered.
If new types of critical events are to be addressed or if the continuity arrangements need to be upgraded for other reasons, the service continuity management process may start continuity improvement initiatives on its own account. Such initiatives are managed through the continuity improvement plan.
Compatibility: The YaSM continuity management process is aligned with ISO 20000, the international standard for service management (see ISO/IEC 20000-1:2018, section 8.7), and it corresponds to the practice of 'ITIL 4 service continuity management'.
Sub-processes
YaSM's service continuity management process has the following sub-processes:
- SP8.1: Assess risks associated with critical events
- Process objective: To identify the disruptive events which need to be managed by the service provider, and to define appropriate continuity arrangements and mechanisms.
- SP8.2: Define continuity improvements
- Process objective: To define the objectives of initiatives to improve service continuity and the approach for their implementation. This includes creating business cases for the initiatives.
- SP8.3: Start up continuity improvement initiatives
- Process objective: To launch initiatives aimed at ensuring or improving service continuity. This includes obtaining authorization by requesting a budget and submitting a request for change.
- SP8.4: Implement continuity arrangements
- Process objective: To implement, test and deploy new or improved continuity arrangements and mechanisms.
- SP8.5: Operate the continuity arrangements
- Process objective: To arrange adequate training to prepare the service provider's staff and customers for critical events, and to ensure regular maintenance and testing of the continuity arrangements and mechanisms.
- SP8.6: Review the continuity arrangements
- Process objective: To submit the continuity arrangements and mechanisms to regular reviews, in order to identify potentials for improvement to be addressed by continuity improvement initiatives.
Process outputs
This section lists the documents and records produced by 'ensure service continuity'. YaSM data objects [*] are marked with an asterisk, while other objects are displayed in gray.
- Budget request
- A budget request is typically issued to obtain funding for setting up, improving or operating a service or process. An approved budget request means that the required financial resources have been allocated by the financial manager. [*]
- Change record
- A change record contains all details of a change, documenting the lifecycle of a single change. In its initial state, a change record describes a request for change (RFC) which is to be assessed and authorized prior to implementing the change. Further information is added as the change progresses through its lifecycle. [*]
- Change status information
- Current status information related to the implementation of a change. This information is sent to the change manager from the various processes that implement authorized changes. It is used by the change manager to keep the change records and the change schedule up-to-date.
- CI record
- Configuration information is maintained in CI records for all configuration items (CIs) under the control of the configuration manager. In this context, CIs can be of various types: Applications, systems and other infrastructure components are treated as CIs, but often also services, policies, project documentation, employees, suppliers, etc. Configuration information is stored in the configuration management system (CMS). [*]
- Continuity improvement plan
- Items in the continuity improvement plan are used by the service continuity manager to record and manage continuity improvement initiatives throughout their lifecycle. Initiatives in the continuity improvement plan may aim to enhance the resilience of services or to put mechanisms in place for the recovery of services in the case of critical events. [*]
- Continuity operation manual
- The continuity operation manual specifies the activities required for the operation of the continuity arrangements and mechanisms operated under the responsibility of the service continuity manager. Some instructions related to the operation of particular security systems may be documented in separate technical manuals or 'standard operating procedures (SOPs)'. [*]
- Continuity review report
- A continuity review report records the details and findings from a continuity review. This report is an important input for the definition of continuity improvement initiatives. [*]
- Data for project plan update
- Current information related to project progress and resource consumption. This information is sent from various service management processes to the project manager as input for project control.
- Guideline for critical events
- The guideline for critical events contains detailed instructions on when and how to invoke the procedure for responding to critical, disruptive events. Most importantly, the guideline defines the first steps to be taken by 1st level support after learning that a (suspected) critical event has occurred. [*]
- Index of continuity-relevant information
- A catalogue of all information that is relevant in the context of responding to critical, disruptive events. This index is maintained and circulated by the service continuity manager to all members of staff with responsibilities for fighting critical events. [*]
- Purchase request
- A request to procure goods or services from an external supplier. Purchasing requests are typically sent to the supplier manager, for example if applications, systems or other infrastructure components are needed for setting up a new service, or if standard infrastructure components and consumables are required for service operation.
- Recovery plan
- Recovery plans contain detailed instructions for returning specific services and/ or systems to a working state, which often includes recovering data to a defined consistent state. [*]
- Register of managed critical events
- The register of managed critical events is a tool used by the service continuity manager to keep an overview of the critical events against which the service provider has decided to set up some kind of protection, considering the potential impacts and occurrence likelihoods. The register of managed critical events also specifies the responses to the identified events, in particular the related service continuity plans. [*]
- Request to assess security risks
- A request to assess security risks, typically issued during service design if new or changed security controls and mechanisms are likely to be needed for a new or improved service.
- Service continuity plan
- A service continuity plan describes how service continuity is ensured with regards to a particular type of critical event. The plan specifies the required preventive measures and describes how to effectively respond to the critical event. Service continuity plans usually include references to more detailed recovery plans with specific instructions for returning applications, systems or other infrastructure components to a working state. [*]
- Suggested continuity improvement
- A suggestion for improving service continuity. Suggestions for continuity improvements may originate from anywhere within the organization.
- Suggested process modification
- A suggestion for modifying one or several service management processes. Suggestions for process modifications or improvements may originate from anywhere within the organization.
- Suggested service modification
- A suggestion for modifying a service, for example to improve service quality or economics. Suggestions may originate from anywhere within or outside of the service provider organization.
- Test report
- A test report provides a detailed account of testing activities. A test report is created for example during tests of new or changed service components, or during tests of security or service continuity mechanisms. [*]
- Test script
- A test script specifies a set of test cases including their expected outcomes. The nature of the test cases will vary depending on what is to be tested. [*]
Notes:
[*] "YaSM data objects" are those documents or records for which the YaSM model provides detailed recommendations: Every YaSM object has an associated checklist (see example) describing its typical contents, and an associated lifecycle diagram depicting how the status of the object changes as it is created, updated, read and archived by various YaSM processes (see example).
"Other objects" are mostly informal data or information where YaSM has less strong views about their contents. There are no associated lifecycle diagrams or checklists.
Process metrics
Process metrics are used, for example, to assess if the service management processes are running according to expectations.
For suggestions of suitable metrics, please refer to the list of metrics for the YaSM service continuity process.
Roles and responsibilities
Process owner: The service continuity manager is responsible for managing risks that could seriously impact the service provider's services. In particular, this role ensures that the service provider can provide minimum agreed service levels in the case of critical, disruptive events.
YaSM role / sub-process | Compli. mgr. | Oper. | Proc. owner | Secur. mgr. | Serv. contin. mgr. | Serv. owner | Techn. domain expert | |
---|---|---|---|---|---|---|---|---|
SP8.1 | Assess risks associated with critical events | - | - | R | - | AR | R | - |
SP8.2 | Define continuity improvements | R | - | - | R | AR | - | - |
SP8.3 | Start up continuity improvement initiatives | - | - | - | - | AR | - | - |
SP8.4 | Implement continuity arrangements | - | R | - | - | AR | - | R |
SP8.5 | Operate the continuity arrangements | - | R | - | - | AR | - | - |
SP8.6 | Review the continuity arrangements | - | - | - | - | AR | - | - |
Notes
Is based on: The service continuity management process from the YaSM Process Map.
By: Stefan Kempter and Andrea Kempter , IT Process Maps.
Process description › Sub-processes › Process outputs › Metrics › Roles