SP6: Manage projects: Difference between revisions

From YaSM Service Management Wiki
No edit summary
No edit summary
Line 2: Line 2:
<meta name="keywords" content="how to manage service management projects, yasm manage projects, yasm project management" />
<meta name="keywords" content="how to manage service management projects, yasm manage projects, yasm project management" />
<meta name="description" content="YaSM process: Manage projects (SP6). - Definition, sub-processes, process outputs, process metrics and roles." />
<meta name="description" content="YaSM process: Manage projects (SP6). - Definition, sub-processes, process outputs, process metrics and roles." />
<meta property="og:url" content="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects" />
<meta property="og:title" content="SP6: Manage projects | YaSM Service Management Wiki" />
<meta property="og:description" content="YaSM process: Manage projects (SP6). - Definition, sub-processes, process outputs, process metrics and roles." />
<meta property="og:site_name" content="YaSM">
<meta property="og:type" content="article" />
<meta property="fb:admins" content="100002035253209" />
<meta property="fb:admins" content="100002592864414" />
<meta property="og:image" content="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" />
<meta property="og:image:width" content="757" />
<meta property="og:image:height" content="429" />
<link href="https://plus.google.com/104150539756444616711/posts" rel="publisher" />
</itpmch>
</itpmch>
<html><div itemscope="itemscope" itemtype="https://schema.org/WebPage"><!-- define schema.org/WebPage --><p>
<html><a href="https://yasm.com/wiki/de/index.php/SP6:_Managen_von_Projekten"><img src="https://yasm.com/wiki/en/img/yasm-wiki/yasm-wiki-deutsch.png" width="48" height="30" style="float:right;" alt="auf Deutsch" title="diese Seite auf Deutsch" /></a><br style="clear:both;"/></html>
<a href="https://yasm.com/wiki/de/index.php/SP6:_Managen_von_Projekten"><img src="https://yasm.com/wiki/en/img/yasm-wiki/yasm-wiki-deutsch.png" width="48" height="30" style="float:right;" alt="auf Deutsch" title="diese Seite auf Deutsch" /></a><br style="clear:both;"/>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p><b>Process name:</b> <a href="#Process_description" title="SP6: Manage projects - Process description">Manage projects</a> - <b>Part of</b>: <a itemprop="isPartOf" href="https://yasm.com/wiki/en/index.php/YaSM_Processes#supporting-service-management-processes" title="YaSM supporting service management processes">Supporting service management processes</a></p>
 
<p><b>Previous process:</b> <a href="https://yasm.com/wiki/en/index.php/SP5:_Assess_and_coordinate_changes" title="SP5: Assess and coordinate changes">Assess and coordinate changes</a></p>
'''Process name:''' [[#Process_description|Manage projects]] - '''Part of:''' [[YaSM_Processes#supporting-service-management-processes|Supporting service management processes]]
<p><b>Next process:</b> <a href="https://yasm.com/wiki/en/index.php/SP7:_Ensure_security" title="SP7: Ensure security">Ensure security</a></html>
 
'''Previous process:''' [[SP5: Assess and coordinate changes|Assess and coordinate changes]]
 
'''Next process:''' [[SP7: Ensure security|Ensure security]]


<p>&nbsp;</p>
<p>&nbsp;</p>
Line 14: Line 27:
==Process description==
==Process description==


<html><div itemscope itemtype="https://schema.org/ImageObject"><a href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" title="Manage projects. - YaSM process SP6, example 1" itemprop="contentUrl"><img style="margin:20px 0px 10px 0px; float:left;" src="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" width="757" height="429" title="Manage projects. - YaSM process SP6, example 1" alt="Fig. 1: Manage projects. - YaSM project process SP6, ex. 1: Strategic initiative coordinated through the project management process." /></a><br style="clear:both;"/><div class="thumbcaption"><span style="font-variant:small-caps;"><b>Figure 1:</b></span> <small><span itemprop="caption">"Manage projects". - YaSM supporting process SP6, ex. 1: Strategic initiative coordinated through the project management process.</span></small></div></div><br style="clear:both;"/>
<html><div itemid="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" itemscope itemtype="https://schema.org/ImageObject">
<a href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" title="Manage projects. - YaSM process SP6, example 1" itemprop="contentUrl">
<meta itemprop="width" content="757" />
<meta itemprop="height" content="429" />
<meta itemprop="keywords" content="yasm project management process" />
<meta itemprop="keywords" content="yasm project management" />
<meta itemprop="keywords" content="service management projects" />
<img style="margin:20px 0px 10px 0px; float:left;" src="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" width="757" height="429" title="Manage projects. - YaSM process SP6, example 1" alt="Fig. 1: Manage projects. - YaSM project process SP6, ex. 1: Strategic initiative coordinated through the project management process." /></a><br style="clear:both;"/>
<div class="thumbcaption"><span style="font-variant:small-caps;"><b>Figure 1:</b></span> <small><span itemprop="caption">"Manage projects". - YaSM supporting process SP6, ex. 1: Strategic initiative coordinated through the project management process.</span></small></div></div><br style="clear:both;"/>


<p><span itemprop="description">The objective of "<strong class="selflink"><span itemprop="name Headline">LP6: Manage projects</span></strong>" is to plan and coordinate the resources to complete a project within time, cost and scope.</span></p>
<p><span id="md-itempage-description" itemprop="description">The objective of "<strong class="selflink">LP6: Manage projects</strong>" is to plan and coordinate the resources to complete a project within time, cost and scope.</span></p>


<p>YaSM recommends executing all initiatives of a larger scale as formal projects (the project policy contains the rules for deciding if a project must be set up).</p>
<p>YaSM recommends executing all initiatives of a larger scale as formal projects (the project policy contains the rules for deciding if a project must be set up).</p>
Line 28: Line 49:
<p>&nbsp;</p>
<p>&nbsp;</p>


<div itemscope itemtype="https://schema.org/ImageObject"><a href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" title="Manage projects. - YaSM process SP6, example 2" itemprop="contentUrl"><img style="margin:0px 10px 10px 0px; float:left;" src="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" width="757" height="352" title="Manage projects. - YaSM process SP6, example 2" alt="Fig. 2: Manage projects. - YaSM project process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process." /></a><br style="clear:both;"/><div class="thumbcaption"><span style="font-variant:small-caps;"><b>Figure 2:</b></span> <small><span itemprop="caption">"Manage projects". - YaSM process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process.</span></small></div></div><br style="clear:both;"/>
<div itemid="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" itemscope itemtype="https://schema.org/ImageObject">
<a href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" title="Manage projects. - YaSM process SP6, example 2" itemprop="contentUrl">
<meta itemprop="width" content="757" />
<meta itemprop="height" content="352" />
<img style="margin:0px 10px 10px 0px; float:left;" src="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" width="757" height="352" title="Manage projects. - YaSM process SP6, example 2" alt="Fig. 2: Manage projects. - YaSM project process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process." /></a><br style="clear:both;"/>
<div class="thumbcaption"><span style="font-variant:small-caps;"><b>Figure 2:</b></span> <small><span itemprop="caption">"Manage projects". - YaSM process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process.</span></small></div></div><br style="clear:both;"/>


<p>As many projects will involve the implementation of a number of changes that have to be tracked, the project management process will regularly report the project status to the change assessment and coordination process.</html>
<p>As many projects will involve the implementation of a number of changes that have to be tracked, the project management process will regularly report the project status to the change assessment and coordination process.</html>
Line 36: Line 62:
==Sub-processes==
==Sub-processes==


<html><div itemscope="itemscope" itemtype="https://schema.org/ItemList"><!-- define schema.org/ItemList -->
<html><!-- define schema.org/CreativeWork --><div itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#Sub-processes" itemscope="itemscope" itemtype="https://schema.org/CreativeWork">
<meta itemprop="itemListOrder" content="Ascending" />
<link itemprop="additionalType" href="http://www.productontology.org/id/Business_process" />
<p><span itemprop="name" content="SP6: Manage projects. - Sub-processes:"><i>"Manage projects"</i> has the following sub-processes:</span>
<meta itemprop="name" content="Project management processes" />
<meta itemprop="alternateName" content="YaSM project management processes: definitions" />
<p><span itemprop="description">YaSM's supporting service management process <i>'SP6: Manage projects'</i> has the following sub-processes:</span>
</p>
</p>
<p>&#160;</p>
<p>&#160;</p>
<p><b><span id="SP6.1" itemprop="itemListElement">SP6.1: Start up projects</span></b></p>
 
<ul><li itemprop="description">Process objective: To define stakeholders, responsibilities and resources available to the project, and to identify risks, constraints and assumptions affecting the project. This process results in an authorized project charter.</li></ul>
<div itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#process-SP6.1" itemscope itemtype="https://schema.org/CreativeWork">
<meta itemprop="alternateName" content="YaSM project management process SP6.1" />
<dl id="SP6.1"><dt itemprop="name">SP6.1: Start up projects</dt>
<dd itemprop="description">Process objective: To define stakeholders, responsibilities and resources available to the project, and to identify risks, constraints and assumptions affecting the project. This process results in an authorized project charter.</dd></dl>
</div>
<p><br /></p>
<p><br /></p>
<p><b><span id="SP6.2" itemprop="itemListElement">SP6.2: Plan projects</span></b></p>
<div itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#process-SP6.2" itemscope itemtype="https://schema.org/CreativeWork">
<ul><li itemprop="description">Process objective: To create and update the project plan, for example with information related to the project deliverables, the project activities and the required resources.</li></ul>
<meta itemprop="alternateName" content="YaSM project management process SP6.2" />
<dl id="SP6.2"><dt itemprop="name">SP6.2: Plan projects</dt>
<dd itemprop="description">Process objective: To create and update the project plan, for example with information related to the project deliverables, the project activities and the required resources.</dd></dl>
</div>
<p><br /></p>
<p><br /></p>
<p><b><span id="SP6.3" itemprop="itemListElement">SP6.3: Control projects</span></b></p>
<div itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#process-SP6.3" itemscope itemtype="https://schema.org/CreativeWork">
<ul><li itemprop="description">Process objective: To monitor and report on project progress and resource consumption, and to initiate corrective action if required.</li></ul>
<meta itemprop="alternateName" content="YaSM project management process SP6.3" />
<dl id="SP6.3"><dt itemprop="name">SP6.3: Control projects</dt>
<dd itemprop="description">Process objective: To monitor and report on project progress and resource consumption, and to initiate corrective action if required.</dd></dl>
</div>
<p><br /></p>
<p><br /></p>
<p><b><span id="SP6.4" itemprop="itemListElement">SP6.4: Review and close projects</span></b></p>
<div itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#process-SP6.4" itemscope itemtype="https://schema.org/CreativeWork">
<ul><li itemprop="description">Process objective: To assess the course of the project and the achieved results, to make sure that any mistakes are analyzed and lessons learned.</li></ul>
<meta itemprop="alternateName" content="YaSM project management process SP6.4" />
</div><!-- end of schema.org/ItemList --><p></html>
<dl id="SP6.4"><dt itemprop="name">SP6.4: Review and close projects</dt>
<dd itemprop="description">Process objective: To assess the course of the project and the achieved results, to make sure that any mistakes are analyzed and lessons learned.</dd></dl>
</div>
</div><!-- end of schema.org/CreativeWork --><p></html>


<p>&nbsp;</p>
<p>&nbsp;</p>
Line 58: Line 99:
==Process outputs==
==Process outputs==


<html><div itemscope="itemscope" itemtype="https://schema.org/ItemList"><!-- define schema.org/ItemList -->
<html><div itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#Process_outputs" itemscope="itemscope" itemtype="https://schema.org/CreativeWork"><!-- define schema.org/CreativeWork -->
<meta itemprop="itemListOrder" content="Ascending" />
<meta itemprop="name" content="YaSM process SP6: documents and records" />
<p>This section lists the <span itemprop="name">documents and records produced by <i>"Manage projects"</i></span>. YaSM data objects <a href="#ydo" title="YaSM data object">[*]</a> are marked with an asterisk, while other objects are displayed in gray.</p>
<meta itemprop="alternateName" content="Project management process outputs" />
<meta itemprop="alternateName" content="Project management data objects" />
<p><span itemprop="description">This section lists the documents and records produced by <i>'Manage projects'</i>.</span> YaSM data objects <a href="#ydo" title="YaSM data object">[*]</a> are marked with an asterisk, while other objects are displayed in gray.</p>
<p>&#160;</p>
<p>&#160;</p>
<p><b><span id="Project-charter" itemprop="itemListElement">Project charter</span></b> <a href="#ydo" title="YaSM data object">[*]</a></p>
 
<ul><li itemprop="description">A project charter is a document that formally authorizes a project. It outlines the project objectives and scope, identifies the main stakeholders, defines the authority of the project manager and the resources at his disposal, and lists any constraints and assumptions affecting the project.</li></ul>
<dl id="Project-charter"><dt>Project charter</dt>
<dd>A project charter is a document that formally authorizes a project. It outlines the project objectives and scope, identifies the main stakeholders, defines the authority of the project manager and the resources at his disposal, and lists any constraints and assumptions affecting the project. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl>
<p><br /></p>
<p><br /></p>
<p><b><span id="Project-issue-log" itemprop="itemListElement">Project issue log</span></b> <a href="#ydo" title="YaSM data object">[*]</a></p>
<dl id="Project-issue-log"><dt>Project issue log</dt>
<ul><li itemprop="description">The project issue log is a document recording important issues and events during the course of a project, in particular issues which require action by the project board or higher levels of management. The issue log is an important tool for managing open issues, but it is also a means of documenting significant events such as decisions to update the project scope or the project milestones.</li></ul>
<dd>The project issue log is a document recording important issues and events during the course of a project, in particular issues which require action by the project board or higher levels of management. The issue log is an important tool for managing open issues, but it is also a means of documenting significant events such as decisions to update the project scope or the project milestones. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl>
<p><br /></p>
<p><br /></p>
<p><b><span id="Project-plan" itemprop="itemListElement">Project plan</span></b> <a href="#ydo" title="YaSM data object">[*]</a></p>
<dl id="Project-plan"><dt>Project plan</dt>
<ul><li itemprop="description">A project plan is a formal, approved document showing the deliverables, milestones, activities and resources for a project. Project plans are used to guide both project execution and project control.</li></ul>
<dd>A project plan is a formal, approved document showing the deliverables, milestones, activities and resources for a project. Project plans are used to guide both project execution and project control. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl>
<p><br /></p>
<p><br /></p>
<p><b><span id="Project-review-report" itemprop="itemListElement">Project review report</span></b> <a href="#ydo" title="YaSM data object">[*]</a></p>
<dl id="Project-review-report"><dt>Project review report</dt>
<ul><li itemprop="description">The results of a project review are documented in a project review report. Project reviews take place during formal project closure. Their aim is to determine if the project was successful and to identify opportunities for improvement.</li></ul>
<dd>The results of a project review are documented in a project review report. Project reviews take place during formal project closure. Their aim is to determine if the project was successful and to identify opportunities for improvement. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl>
<p><br /></p>
<p><br /></p>
<p><b><span id="Project-status-report" itemprop="itemListElement">Project status report</span></b> <a href="#ydo" title="YaSM data object">[*]</a></p>
<dl id="Project-status-report"><dt>Project status report</dt>
<ul><li itemprop="description">A project status report is generated at regular intervals during the course of a project. It provides an overview of the current project status and highlights, in particular, any deviations regarding project scope, schedule and cost, including measures taken to address the deviations.</li></ul>
<dd>A project status report is generated at regular intervals during the course of a project. It provides an overview of the current project status and highlights, in particular, any deviations regarding project scope, schedule and cost, including measures taken to address the deviations. <a href="#ydo" title="YaSM data object">[*]</a></dd></dl>
<p><br /></p>
<p><br /></p>
<p><b><span itemprop="itemListElement" style="color:#636363">Suggested process modification</span></b></p>
<dl style="color:#636363"><dt>Suggested process modification</dt>
<ul><li itemprop="description" style="color:#636363">A suggestion for modifying one or several service management processes. Suggestions for process modifications or improvements may originate from anywhere within the organization.</li></ul>
<dd>A suggestion for modifying one or several service management processes. Suggestions for process modifications or improvements may originate from anywhere within the organization.</dd></dl>
</div><!-- end of schema.org/ItemList --><p>
</div><!-- end of schema.org/CreativeWork --><p>


<p>&nbsp;</p>
<p>&nbsp;</p>
Line 92: Line 136:


<html><p>Process metrics are used, for example, to assess if the service management processes are running according to expectations.</p>
<html><p>Process metrics are used, for example, to assess if the service management processes are running according to expectations.</p>
<p>For suggestions of <a itemprop="significantLinks" href="https://yasm.com/wiki/en/index.php/YaSM_Metrics" title="How to measure the performance of the YaSM processes - Process metrics">suitable metrics</a>, please refer to the <a itemprop="significantLinks" href="https://yasm.com/wiki/en/index.php/YaSM_Metrics/_Supporting_Service_Management_Processes#metrics-sp6" title="Metrics for the YaSM process SP6: Manage projects.">list of metrics for <span itemprop="alternativeHeadline">YaSM's project management process</span></a>.</html>
<p>For suggestions of <a href="https://yasm.com/wiki/en/index.php/YaSM_Metrics" title="How to measure the performance of the YaSM processes - Process metrics">suitable metrics</a>, please refer to the <a href="https://yasm.com/wiki/en/index.php/YaSM_Metrics/_Supporting_Service_Management_Processes#metrics-sp6" title="Metrics for the YaSM process SP6: Manage projects.">list of metrics for <span itemprop="alternativeHeadline">YaSM's project management process</span></a>.</html>


<p>&nbsp;</p>
<p>&nbsp;</p>
Line 138: Line 182:
<p>&nbsp;</p>
<p>&nbsp;</p>


==[ Infobox ]==
== Notes ==
Is based on: The project management process from the [https://yasm.com/en/products/yasm-process-map YaSM Process Map].
 
<html>By:&#160;&#160;Stefan Kempter&#160;<a rel="author" href="https://plus.google.com/111925560448291102517/about"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/google.jpg" width="16" height="16" title="By: Stefan Kempter | Profile on Google+" alt="Author: Stefan Kempter, IT Process Maps GbR" /></a>&#160;&#160;and&#160;&#160;Andrea Kempter&#160;<a href="https://plus.google.com/113316270668629760475/about"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/google.jpg" width="16" height="16" title="By: Andrea Kempter | Profile on Google+" alt="Contributor: Andrea Kempter, IT Process Maps GbR" /></a>, IT Process Maps.


<html><table class="wikitable">
<p>&nbsp;</p>
<tr>
<td>Link to this page:</td>
<td><a itemprop="url" href="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects">https://yasm.com/wiki/en/index.php/SP6:_Manage_projects</a></td>
</tr>
<tr>
<td>Languages:</td>
<td><span itemprop="inLanguage" content="en">English</span> | <span><a itemprop="citation" class="external TEXT" href="https://yasm.com/wiki/de/index.php/SP6:_Managen_von_Projekten" title="SP6: Managen von Projekten">Deutsch</a></span></td>
</tr>
<tr>
<td>Image:</td>
<td style="vertical-align:top"><a itemprop="primaryImageOfPage" href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" title="Manage projects. - YaSM process SP6, example 1.">YaSM LP6: Manage projects (.JPG)</a></td>
</tr>
<tr>
<td>Author | Contributor:</td>
<td><span itemprop="author">Stefan Kempter</span>&nbsp;<a rel="author" href="https://plus.google.com/111925560448291102517"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/google.jpg" width="16" height="16" title="By: Stefan Kempter | Profile on Google+" alt="Author: Stefan Kempter, IT Process Maps GbR" /></a> &nbsp; and <span itemprop="contributor">Andrea Kempter</span>&nbsp;<a href="https://plus.google.com/113316270668629760475"><img style="margin:0px 0px 0px 0px;" src="/wiki/en/img/yasm-wiki/bookmarking/google.jpg" width="16" height="16" title="By: Andrea Kempter | Profile on Google+" alt="Contributor: Andrea Kempter, IT Process Maps GbR" /></a> &nbsp; - &nbsp; <span itemprop="creator copyrightHolder publisher">IT Process Maps</span>.</td>
</tr>
</table>


<p><small>
<p><small>
Line 176: Line 206:
</span>
</span>
</small></p>
</small></p>
</div><!-- end of schema.org/WebPage --><p></html>
 
<!-- define schema.org/ItemPage --> <span itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects" itemscope itemtype="https://schema.org/ItemPage" itemref="md-itempage-description">
  <link itemprop="additionalType" href="http://www.productontology.org/id/Business_process" />
  <meta itemprop="name Headline" content="LP6: Manage projects" />
  <meta itemprop="alternativeHeadline" content="YaSM's project management process" />
  <link itemprop="url" href="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects" />
  <span itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#Sub-processes" itemscope itemtype="https://schema.org/CreativeWork">
  </span>
  <span itemprop="hasPart" itemid="https://yasm.com/wiki/en/index.php/SP6:_Manage_projects#Process_outputs" itemscope itemtype="https://schema.org/CreativeWork">
  </span>
  <link itemprop="primaryImageOfPage" href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" />
  <link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex1.jpg" />
  <link itemprop="image" href="https://yasm.com/wiki/en/img/yasm-process/Manage-projects-yasm-sp6-ex2.jpg" />
  <meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics" />
  <meta itemprop="significantLinks" content="https://yasm.com/wiki/en/index.php/YaSM_Metrics/_Supporting_Service_Management_Processes#metrics-sp6" />
  <link itemprop="isPartOf" href="https://yasm.com/wiki/en/index.php/YaSM_Processes#supporting-service-management-processes" />
  <meta itemprop="isBasedOnUrl" content="https://yasm.com/en/products/yasm-process-map" />
  <meta itemprop="inLanguage" content="en" />
  <link itemprop="citation" href="https://yasm.com/wiki/de/index.php/SP6:_Managen_von_Projekten" />
  <link itemprop="publisher" href="https://yasm.com/en/#YaSMBrand" />
  <link itemprop="copyrightHolder creator" href="https://yasm.com/en/contact#ITProcessMapsOrg" />
  <link itemprop="author" href="https://yasm.com/en/misc/team#StefanKempter" />
  <link itemprop="contributor" href="https://yasm.com/en/misc/team#AndreaKempter" />
</span><p></html>


<!-- This page is assigned to the following categories: -->
<!-- This page is assigned to the following categories: -->
[[Category:YaSM process]]
[[Category:YaSM process]]
<!-- --- -->
<!-- --- -->

Revision as of 11:04, 15 November 2016

auf Deutsch

 

Process name: Manage projects - Part of: Supporting service management processes

Previous process: Assess and coordinate changes

Next process: Ensure security

 

Process description

Fig. 1: Manage projects. - YaSM project process SP6, ex. 1: Strategic initiative coordinated through the project management process.
Figure 1: "Manage projects". - YaSM supporting process SP6, ex. 1: Strategic initiative coordinated through the project management process.


The objective of "LP6: Manage projects" is to plan and coordinate the resources to complete a project within time, cost and scope.

YaSM recommends executing all initiatives of a larger scale as formal projects (the project policy contains the rules for deciding if a project must be set up).

The impetus to start up a project may come from various sources, depending on the nature of the initiatives that are to be executed. Typical examples are:

  • Strategic initiatives with the aim of establishing a new or significantly changed service (see Example 1 above)
  • Process improvement initiatives and service improvement initiatives (see Example 2 below)
  • Initiatives to improve service security or continuity.

 

Fig. 2: Manage projects. - YaSM project process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process.
Figure 2: "Manage projects". - YaSM process SP6, ex. 2: Process or service improvement initiative coordinated through the project management process.


As many projects will involve the implementation of a number of changes that have to be tracked, the project management process will regularly report the project status to the change assessment and coordination process.

 

Sub-processes

YaSM's supporting service management process 'SP6: Manage projects' has the following sub-processes:

 

SP6.1: Start up projects
Process objective: To define stakeholders, responsibilities and resources available to the project, and to identify risks, constraints and assumptions affecting the project. This process results in an authorized project charter.


SP6.2: Plan projects
Process objective: To create and update the project plan, for example with information related to the project deliverables, the project activities and the required resources.


SP6.3: Control projects
Process objective: To monitor and report on project progress and resource consumption, and to initiate corrective action if required.


SP6.4: Review and close projects
Process objective: To assess the course of the project and the achieved results, to make sure that any mistakes are analyzed and lessons learned.

 

Process outputs

This section lists the documents and records produced by 'Manage projects'. YaSM data objects [*] are marked with an asterisk, while other objects are displayed in gray.

 

Project charter
A project charter is a document that formally authorizes a project. It outlines the project objectives and scope, identifies the main stakeholders, defines the authority of the project manager and the resources at his disposal, and lists any constraints and assumptions affecting the project. [*]


Project issue log
The project issue log is a document recording important issues and events during the course of a project, in particular issues which require action by the project board or higher levels of management. The issue log is an important tool for managing open issues, but it is also a means of documenting significant events such as decisions to update the project scope or the project milestones. [*]


Project plan
A project plan is a formal, approved document showing the deliverables, milestones, activities and resources for a project. Project plans are used to guide both project execution and project control. [*]


Project review report
The results of a project review are documented in a project review report. Project reviews take place during formal project closure. Their aim is to determine if the project was successful and to identify opportunities for improvement. [*]


Project status report
A project status report is generated at regular intervals during the course of a project. It provides an overview of the current project status and highlights, in particular, any deviations regarding project scope, schedule and cost, including measures taken to address the deviations. [*]


Suggested process modification
A suggestion for modifying one or several service management processes. Suggestions for process modifications or improvements may originate from anywhere within the organization.

 


Notes:

[*] "YaSM data objects" are those documents or records for which the YaSM model provides detailed recommendations: Every YaSM object has an associated checklist (see example) describing its typical contents, and an associated lifecycle diagram depicting how the status of the object changes as it is created, updated, read and archived by various YaSM processes (see example).

"Other objects" are mostly informal data or information where YaSM has less strong views about their contents. There are no associated lifecycle diagrams or checklists.

 

Process metrics

Process metrics are used, for example, to assess if the service management processes are running according to expectations.

For suggestions of suitable metrics, please refer to the list of metrics for YaSM's project management process.

 

Roles and responsibilities

Process owner: Project manager

  • The project manager is responsible for directing a project, which includes responsibility for delivering the agreed project deliverables within the agreed time and budget.

 

Responsibility matrix: "SP6: Manage projects"
YaSM role / sub-process Project board Project manager Project owner
SP6.1 Start up projects R AR R
SP6.2 Plan projects R AR R
SP6.3 Control projects R AR R
SP6.4 Review and close projects R AR R

 

Notes

Is based on: The project management process from the YaSM Process Map.

By:  Stefan Kempter   and  Andrea Kempter Contributor: Andrea Kempter, IT Process Maps GbR, IT Process Maps.

 

 ›  ›  ›  ›